Water Based Ink Recycling and Rinse Water Management
- Category: Company News
- Author: Xinshida
- Published: 2026-11-26 10:09:16
- Views: 192
Summary: Rinse water management explained for corrugated converting equipment: working ranges, setup sequence, tolerance control and corrective action for excess water use.
Water Based Ink Recycling and Rinse Water Management
Summary: Rinse water management explained for corrugated converting equipment: working ranges, setup sequence, tolerance control and corrective action for excess water use.
- Category: Company News
- Author: Xinshida
- Published: 2026-11-26 10:09:16
- Views: 192
Setting Values and Acceptable Ranges
The table below gives typical working values used for rinse water management on standard corrugated converting equipment. They are starting points for a setup, not acceptance limits; the limits for a given order should be taken from the job specification and the measured condition of the board being run.
Parameter | Typical working value | How it is used |
Rinse water per plate wash | 8 to 15 litres | Verify against the machine specification and the board grade in use. |
Returned ink fraction | 60 to 80 percent | Measure at production speed after the line has warmed up. |
Settling time | above 2 hours | Record on the setup sheet at the start of each order. |
Filter mesh | 100 to 150 micrometres | Recheck after any tooling or material change. |
Each value should be recorded together with the board grade, flute type and line speed at which it was measured. A value taken while the line is running at production speed is more useful than one taken with the machine stopped, because belt tension, thermal growth and board behaviour all change once the line is up to speed.
How Rinse water management Affects the Process
The plate washing and ink return station works within a narrow window defined by rinse water and ink return. When rinse water per plate wash is held at 8 to 15 litres, the process stays repeatable; as soon as the value leaves that window, the first visible sign is excess water use. Understanding that chain of cause and effect is more useful than memorising a single number, because the correct value shifts with board grade, flute type and line speed.
Settling tank and filtration interact with the setting, so an adjustment made to one of them should never be treated as independent. For example, a change that improves the result at low speed can behave differently at production speed, which is why the same check is repeated after the line has stabilised. Board is a hygroscopic material, so the same setting can behave differently on a dry morning and a humid afternoon. Recording temperature and humidity alongside the setting makes the record comparable.
Building a Reliable Setup History
Every order should leave behind a record of rinse water per plate wash, returned ink fraction, the board grade and the measured first off result. When the order returns, that record shortens setup and reduces trial sheets, which is the most direct saving available for short run work.
Additional Practical Notes
Rinse water management is checked against the job card at the start of each order, and the reading is filed with the board grade and the line speed at which it was taken. Trial sheets used for setup are counted separately, so the true waste of a changeover stays visible in the shift figures.
Shift Level Checklist
Confirm the job recipe, the board grade and the drawing before the first sheet of rinse water management is checked.
Verify rinse water per plate wash against the setup sheet at the start of each shift rather than after a complaint.
Record the measured result of every first off sample so that drift can be seen across orders.
Keep rinse water and ink return clean and inspect them for wear at the defined interval.
Watch for excess water use and correct one variable at a time, measuring after each change.
File the final setting, the correction made and the reason for it at handover.
Practical Summary
Stable rinse water management comes from a measured target, a defined tolerance and a routine that is followed on every order. Keep rinse water per plate wash at 8 to 15 litres, verify the first off sample, watch for excess water use and record every correction. Those habits do more for output and consistency than a single large adjustment made after a complaint.
Figures quoted in this article are typical working values for standard corrugated converting equipment. They should be verified against the specification of the machine in use, the board grade being processed and the conditions measured on the shift before they are used as acceptance limits.
References
[1] ISO 12647-2:2013, Graphic technology - Process control for the production of half-tone colour separations, proof and production prints - Part 2: Offset lithographic processes.
[2] ISO 9001:2015, Quality management systems - Requirements.
[3] TAPPI T 804 om-12, Compression test of fiberboard shipping containers.
[4] TAPPI T 839 pm-13, Edgewise compressive strength of corrugated fiberboard (short column test).
[5] ASTM D642-15, Standard Test Method for Determining Compressive Resistance of Shipping Containers, Components, and Unit Loads.
[6] EN 415-1:2014, Safety of packaging machines - Part 1: Terminology and classification of packaging machines and associated equipment.
[7] IEC 60204-1:2016, Safety of machinery - Electrical equipment of machines - Part 1: General requirements.
扫二维码用手机看
Address: Dongguang County, Cangzhou City, Hebei Province, China
Phone: +86 13930771388
WhatsApp: +86 13930771388
Email: 1971637272@qq.com
Website: https://www.xinshidamfg.com
- Follow Xinshida -
Copyright © 2019 Cangzhou Xinshida Machinery Equipment Co., Ltd.