Ink Wastewater Treatment for Corrugated Printing Plants
- Category: Company News
- Author: Xinshida
- Published: 2026-11-20 12:19:46
- Views: 0
Summary: The process route for treating water based ink wastewater from flexographic printing: collection, coagulation, separation, biological polishing and reuse.
Ink Wastewater Treatment for Corrugated Printing Plants
Summary: The process route for treating water based ink wastewater from flexographic printing: collection, coagulation, separation, biological polishing and reuse.
- Category: Company News
- Author: Xinshida
- Published: 2026-11-20 12:19:46
- Views: 0
The process route for treating water based ink wastewater from flexographic printing: collection, coagulation, separation, biological polishing and reuse. This article sets out the practical points that matter on the shop floor: what the equipment does, which settings decide the result, what to measure and how to keep performance stable across shifts. It is written for plant managers, production engineers and operators who need to make a decision or fix a problem today, and it applies to wastewater treatment unit as operated in a working corrugated plant rather than on a demonstration stand.
Sources and Characteristics of the Wastewater
Water based flexo printing generates wastewater from press washing, anilox cleaning, ink returns and floor cleaning. The stream carries pigment, resin, starch and surfactant, so it is high in suspended solids and in chemical oxygen demand, and its characteristics change with every job change.
Treatment Route
The usual route is equalisation, chemical coagulation with a suitable coagulant, flocculation, and separation by dissolved air flotation or sedimentation. The clarified water then passes a biological or advanced oxidation stage before it can be reused for cleaning or discharged to a municipal sewer under a permit.
Sludge Handling
The sludge produced by coagulation contains pigment and resin and must be dewatered, usually by a filter press or screw press, then handled as industrial waste. Sludge volume is driven by coagulant dose, so over dosing increases both chemical cost and disposal cost without improving water quality.
Compliance and Record Keeping
Most plants operate under a discharge permit that sets limits for pH, suspended solids, chemical oxygen demand and sometimes colour. Sampling at a defined point, keeping a log of treatment chemicals and retaining laboratory reports are the practical basis for demonstrating compliance during an inspection.
A practical checklist for the shift supervisor
At the start of the shift, confirm the job sequence, the tooling and the material are ready; at first off, confirm the settings match the recipe and the sample meets specification; during the run, check the sample at fixed intervals and record the readings; at changeover, record the waste sheets used and note any setting that had to be changed. This routine is short enough to be followed on a busy shift and detailed enough to expose drift early.
Spare parts and wear items that decide uptime
Availability is decided by the wear items, not by the frame. Doctor blades, anvil covers, creasing wheels, slitting blades and glue nozzles are consumed continuously, and a machine that waits for a delivery loses far more than the part costs. Holding a small buffer of these items, and replacing them at a planned interval rather than at failure, keeps output predictable and protects the quality of the product leaving the plant.
How to specify a new machine from the order book
Specifications should be written from the order book, not from a brochure. Take the largest and smallest sheet, the heaviest board grade and the most demanding print job, then add a margin for the work you expect to win next year. A specification that exactly matches today's largest order leaves no room for growth and usually forces an early upgrade, which is far more expensive than buying the right capacity once.
Layout, access and material flow
The best machine in the plant still underperforms if material cannot reach it. Space for the incoming board, a route for the printed bundles and access for tooling changes all belong in the layout. Layout decisions made on a drawing without walking the route usually produce a line where the operator spends the shift moving pallets instead of running the machine.
Typical treatment reference
| Process | Equalisation, coagulation, flotation, polishing |
| Capacity | Sized on peak daily flow and pollutant load |
| Sludge handling | Filter press or screw press dewatering |
| Reuse | Clarified water recycled for cleaning duties |
References
ISO 12647-2:2013, Graphic technology - Process control for the production of half-tone colour separations, proof and production prints - Part 2: Offset lithographic processes.
ISO 9001:2015, Quality management systems - Requirements.
TAPPI T 1210, Standard practice for estimating the edge crush test of corrugated fiberboard.
TAPPI T 804, Compression test of fiberboard shipping containers.
FEFCO/ESBO Technical Manual, International fibreboard case industry documentation on corrugated board construction and box design.
Figures quoted in this article are typical working values for standard corrugated converting equipment and should be verified against the specification of the machine in use and the board grade being processed.
Shift level checklist for ink wastewater treatment
Confirm the job recipe against the drawing and the board grade before the first sheet is run on the sludge handling.
Verify ink wastewater treatment against the supplier specification at the start of each shift rather than after a complaint.
Record the measured result of every first off sample, so that drift can be seen across orders and not only within one.
Keep wear parts for the treatment stages available on site, and replace them at the planned interval instead of at failure.
Review water reuse at the end of each order while the evidence is still fresh, and note any setting that had to be changed.
扫二维码用手机看
Address: Dongguang County, Cangzhou City, Hebei Province, China
Phone: +86 13930771388
WhatsApp: +86 13930771388
Email: 1971637272@qq.com
Website: https://www.xinshidamfg.com
- Follow Xinshida -
Copyright © 2019 Cangzhou Xinshida Machinery Equipment Co., Ltd.